EPOXY FLOOR WORK ON PIT LIFT T.12/3
Pengumuman Pengumuman

EPOXY FLOOR WORK ON PIT LIFT T.12/3

Minggu, 30 Agustus 2020 • 7 Pembaca • 914 Hits
EPOXY

EPOXY FLOOR WORK ON PIT LEVEL T.12/3

Residents of Tower 12@
Taman Rasuna Apartments

We will do Epoxy floor work on Pit Lift T.12/3 which will be carried out on:

September 2, 2020  – September 7, 2020

Implementation of work:
8.30am – 5.45pm
8.30am – 12pm
1pm – 5.45pm

Additional information: 
1. Whilst work is performed, the elevator will not function.
2. For Residents who wish to load/unload goods, the elevator will function until the process is done.


Building Management of Taman Rasuna Apartments

Pusat Bantuan Apartemen Taman Rasuna
Instagram Apartemen Taman Rasuna