We inform you that coring or breaking work will be carried out, pipe installation (mirroring) and pressure test or water pressure test in Tower 8 and 9 start on :
Day/date : Monday, March 15, 2021 to Wednesday, March 31, 2021
Time : 9 am – 4 pm
(Schedule Attached)
During the coring or breaking work, there will be a lot of noise which might disturbing, for pipe installation (mirroring) and pressure test will not cause noise disturbance. The water flow to the unit continues as usual.
We appreciate your cooperation.
Building Management of Taman Rasuna Apartments
We inform you that coring or breaking work will be carried out, pipe installation (mirroring) and pressure test or water pressure test in Tower 8 and 9 start on :
Day/date : Monday, March 15, 2021 to Wednesday, March 31, 2021
Time : 9 am – 4 pm
(Schedule Attached)
During the coring or breaking work, there will be a lot of noise which might disturbing, for pipe installation (mirroring) and pressure test will not cause noise disturbance. The water flow to the unit continues as usual.
We appreciate your cooperation.
Building Management of Taman Rasuna Apartments
PENGUMUMAN
Rabu, 20 November 2024
Sabtu, 16 November 2024
Jumat, 15 November 2024
Jumat, 15 November 2024
Kamis, 14 November 2024
KEGIATAN
Selasa, 07 Februari 2023
Selasa, 07 Februari 2023
Senin, 30 Januari 2023