EPOXY FLOOR WORK ON PIT LIFT T.11/3
Minggu, 30 Agustus 2020
EPOXY FLOOR WORK ON PIT LIFT T.11/3
Residents of Tower 11@
Taman Rasuna Apartments
We will do Epoxy floor work on Pit Lift T.11/3 which will be carried out on:
August 31, 2020 – September 1, 2020
Implementation of work:
(red): 8.30am – 5.45pm
(blue): 8.30am – 12pm
(yellow): 1pm – 5.45pm
Additional information:
1. Whilst work is performed, the elevator will not function.
2. For Residents who wish to load/unload goods, the elevator will funtion until the process is done.
Your cooperation is appreciated.
Building Management of Taman Rasuna Apartments